Oil & Gas Industry
Project Insights
Lifecycle Extension & Retrofitting
Newatt recently achieved a milestone in the Oil & Gas Sector by successfully extending the lifecycle of critical electrical apparatuses of 3MW industrial chemical plant through predictive technologies, and strategic upgrades in the existing Infrastructure facility. This initiative enhanced equipment reliability, minimized downtime, and optimized capital expenditure for our client, with support of advance analyzing equipment's Newatt have also identified power quality issues from utility ,addressed fluctuations and imbalances, ensuring a stable and efficient power supply.
Optimizing Electrical Infrastructure with Drona
Newatt spearheads a project targeting the integration of smart grid technologies to optimize electrical infrastructure. They have achieved Real-time monitoring and control enhance distribution efficiency, minimizing energy losses through utilization of their own EMS for a Co-GAS plant, we have successfully coupled with energy storage systems & Solar station, strategically for backup power and deployed mitigate demand fluctuations, ensuring a stable power supply. Our initiative extends to embracing Distributed Energy Resources (DERs) like solar Stations and BESS promoting local energy generation at Load end and reducing transmission losses.